Project Scheduling and Management for Construction

by
Edition: 4th
Format: Paperback
Pub. Date: 2013-09-30
Publisher(s): RSMeans
List Price: $118.17

Buy New

Usually Ships in 3-4 Business Days
$112.54

Rent Textbook

Select for Price
There was a problem. Please try again later.

Rent Digital

Rent Digital Options
Online:1825 Days access
Downloadable:Lifetime Access
$99.60
*To support the delivery of the digital material to you, a non-refundable digital delivery fee of $3.99 will be charged on each digital item.
$99.60*

Used Textbook

We're Sorry
Sold Out

How Marketplace Works:

  • This item is offered by an independent seller and not shipped from our warehouse
  • Item details like edition and cover design may differ from our description; see seller's comments before ordering.
  • Sellers much confirm and ship within two business days; otherwise, the order will be cancelled and refunded.
  • Marketplace purchases cannot be returned to eCampus.com. Contact the seller directly for inquiries; if no response within two days, contact customer service.
  • Additional shipping costs apply to Marketplace purchases. Review shipping costs at checkout.

Summary

First published in 1988 by RS Means, the new edition of Project Scheduling and Management for Construction has been substantially revised for students enrolled in construction management and civil engineering programs. While retaining its emphasis on developing practical, professional-level scheduling skills, the new edition is a relatable, real-world case study that can be used over the course of a semester. The book also includes classroom elements like exercises, quizzes, skill-building exercises, as well as an instructor's manual including two additional new cases.

Author Biography

David R. Pierce, Jr. has been involved in construction project management for more than forty years as a Professor of Construction Management, and as a scheduler, project engineer, and consultant on commercial and industrial projects. His teaching career includes service at the University of Florida, California Polytechnic State University, San Luis Obispo, and Southern Polytechnic State University, Marietta, Georgia. His field experience includes working as a consultant specializing in CPM scheduling, and in forensic consulting, specializing in cost and delay claims.

Table of Contents

1 Project Management Fundamentals

What Is Management in General?

What Is Project Management?

Why Use Project Management?

The Benefits

Variables That Affect the Project

The Project Control Cycle

Introduction to CPM Scheduling

Introduction to the Sample Building Project

Summary

Review Questions

2 Pre-Planning Investigation

Identifying Key Personnel

Providing Data to the Project Team

Contract Document Review

Estimate Review/Estimator Meeting

Initial Project Team Meeting

Pre-Planning with Other Parties

Summary

Review Questions

3 Planning the Project

Breaking the Job Down into Activities

Establishing the Sequence of Work

Summary

Practice Logic Problems

4 Scheduling the Project

Estimating Durations

Actual Calculation of Activity Durations

Calculating Overall Job Duration

Advanced Calculations

Calendars

Summary

Practice Problems

5 Publishing the Schedule

Checking the Final Schedule

Key Questions to Ask

Tasks That Must Be Performed in Order to Provide the Right Information

Types of Coding Schemes

Sample Reports: Office Building

Summary

Review Questions

6 Monitoring and Controlling the Project

The Monitoring Process

Monitoring Progress

Taking Corrective Action

Example Update Problem

Summary

Review Questions

7 Resource Management

How to Manage Resources

The Resource Management Process

Development of the Resource Profile

Adjusting the Schedule to Improve the Resource Curve

Practical Aspects of Resource Management

Other Applications: Earned Value

Other Applications: Cost Loaded Schedules

Summary

Review Questions

8 Procurement Scheduling

The Source of the Problem

Basic Procurement Procedures

Key Elements in Successful Procurement

Record Keeping and Tracking

Issues with Scheduling Procurement Activities

Reporting

Follow-up on the Information

Summary

Review Questions

9 Line of Balance Scheduling

When to Use Line of Balance Scheduling

General Technique

Example Problem

Updating a Line of Balance Schedule

Review Questions

Practice Problems

Appendix A Vehicle Maintenance Facility Drawings

Appendix B

Appendix C

Notes on Schedule Sequencing

An electronic version of this book is available through VitalSource.

This book is viewable on PC, Mac, iPhone, iPad, iPod Touch, and most smartphones.

By purchasing, you will be able to view this book online, as well as download it, for the chosen number of days.

Digital License

You are licensing a digital product for a set duration. Durations are set forth in the product description, with "Lifetime" typically meaning five (5) years of online access and permanent download to a supported device. All licenses are non-transferable.

More details can be found here.

A downloadable version of this book is available through the eCampus Reader or compatible Adobe readers.

Applications are available on iOS, Android, PC, Mac, and Windows Mobile platforms.

Please view the compatibility matrix prior to purchase.